Imagine having to clear a blocked well in the deep waters of the North Sea in winter safely and with huge amounts of money at stake.

That was the challenge facing Sarah De Boer from operator Centrica when the flow of oil from a well in the Chestnut Field declined steeply. A build-up of scale had slowed the flow to the floating production, storage and offloading (FPSO) vessel, Hummingbird.

The well had to be shut in to prevent further scaling, losing nearly 2,000 barrels of the field’s daily production. The only other oil-producing well on the field was also shut in awaiting treatment to prevent scaling, leaving Hummingbird with no incoming production but very high running costs.

 

Download the full case study.

Share this page

Recommended blogs

Pursuit of happiness

4 October 2016

Save for later

Favourite

Recommended news

PMO wisdom interview with Mike Kane, 20th June 2016

2 October 2016

As part of bringing real PMOs to our members, our PMO Wisdom Series provides us with an opportunity to interview PMO professionals that bring new and interesting points of view regarding the industry. The following transcript details our committee member Marisa Silva interviewing Mike Kane.

Save for later

Favourite

Save for later

Favourite

Join APM

Sign up to the APM Newsletter.