Conducting Integrated Baseline Reviews

Conducting Integrated Baseline Reviews

Paperback

£20.00

A Guide to Conducting Integrated Baseline Reviews (IBR) describes the process of performing a technical and schedule review to establish a balanced understanding of the planning maturity of the project. The IBR will review:

  • the project management plan;
  • the methods and metrics used to measure contract performance or progress;
  • the management control processes that operate during the project’s execution;
  • the technical merits of the schedule;
  • the risk associated with the baseline.

Based on tried and tested techniques developed by the military, it is applicable to projects of all sizes in all industry sectors.

Readers of this publication may also be interested in Planning, Scheduling, Monitoring and Control, Introduction to Project Control and Introduction to Project Planning

Download sample chapter

Member download

Paperback: 246x189mm, 94pp, 2016
Author: APM Planning, Monitoring and Control Specific Interest Group
Publisher: APM 
ISBN: 978-1-903494-49-3   
Price: £20.00

APM members should contact Turpin Distribution on +44 (0)1767 604951 to receive their 10% discount

Posted in Planning & control
Join APM

Sign up to the APM Newsletter.